|
On trail 888 a few miles north of Adams Trail there is a new trail that heads north to Grand Marais.
This connector was originally used for the
U.P. 200 Sled Dog Race
in 2004 but would not be signed until the 04-05 season.
Below are some photos taken before the trail opened.
|